Introduction
Installation of our Rivian R1T Cross Bar Mounted MOLLE Panel Kit is very straight forward, making use of factory mounting locations with zero modification to your truck. Getting the panels installed should take 10-20 min with simple hand tools but deciding how you'll situate your gear (the fun part) can take as long as you'd like.
Install Time & Difficulty
10 - 15 minutes per side
Easy
Tools
5/32 Allen Key
7/16" Wrench or Socket
Video Install Guide
Related Content
We've also installed a set of the Rivian Maxtrax recovery boards and mounts on our panels. This is made easy using a set of the BuiltRight MOLLE Nuts (#201023). Check out the install video below.
Comments
0 comments
Please sign in to leave a comment.